VTS IT
Proposal · Content Machine
Prepared by Macrobin for VTS IT · August 2026

You already have the best story in managed IT. It's time someone told it every week.

VTS IT is the company willing to say what every other MSP won't: that "fixed cost" usually isn't. That story deserves better than one video from 2024. This proposal is a content system that turns your honesty into a weekly presence on LinkedIn — produced, quality-checked and scheduled for you, with your total involvement measured in minutes.

Updated 3 September 2026 · v5

What your feedback changed

Glenn and Sue reviewed the first set and corrected us on how the One Cost Model actually works. Every asset below has been rebuilt accordingly, and those corrections are now written into a claims file the machine checks against before anything is produced — so the same error cannot be made twice.

"After-hours — covered"
Monitoring and alerting after-hours is included. Work done overnight or at a weekend is chargeable — and the choice to call it out is the client's.
"Server dies — not covered"
Infrastructure, not servers. The labour to repair and rebuild is included; replacement hardware is included on HaaS.
"This is where the meter starts"
The story is out-of-scope work, not after-hours. That framing undercut the One Cost message.
"What is your after-hours rate?"
"What is your out of scope rate?" — plus budget certainty as the closing question.
Every post on the same navy ground
Sue: backgrounds should change three or four times before repeating, so the company page doesn't read "same same". The statics below now rotate four brand grounds — navy, off white, near black, interface blue — by post, so a carousel stays consistent inside while the page grid varies.
Both videos cut to 30 seconds
Sue: "the videos are a little fast, can this be slowed down bit so the content is readable in a natural rhythm." Correct — they were cut to a conventional length and the text made to fit. Both have been re-cut so the reading rhythm sets the length: 40 and 39 seconds. Nothing on screen changed; it simply has room to breathe.
"Out of scope" simply "doesn't exist"
Sue, 28 August: "clarifying that there is - no out of scope during business hours." Correct, and more precise than we had it. Every caption and the Tuesday video now carry the business-hours qualifier, and it is written into the claims file as an approved claim — with the unqualified version added to the forbidden list, so the machine cannot drift back to it.
The peach ground, proposed 28 August
Sue, 29 August: "The peach background doesn't work …please revert to the original off white colour." Reverted — off white is back in the rotation and peach is out of the kit. It is also now written into the week gate: a ground the client has not approved cannot be scheduled, so a sample can never quietly become a post.
A coral ground, offered on five different rungs
Sue, 31 August: "The coral background does not work, I don’t like any of them … can we just incorporate more of the coral intermittently on the graphics - subtly. The first 4 in the row of 5 are good." All five coral grounds are withdrawn and the rotation stays at the four you confirmed. Coral now arrives as an accent instead — a rail down the edge and a warmed quote mark, on every other post rather than all of them. Written into the week gate as a check: a week that puts it on everything fails, and so does a week that leaves it off entirely.
No way to contact VTS IT on the posts themselves
Sue, 2 September: "there is no prompt to contact VTS IT or a phone number or website. Can this be included in all posts please". Correct, and the gap was uneven rather than total — the carousel and both videos ended on a card carrying the website, and the single feed posts, which are the ones most likely to be seen on their own, carried nothing at all. Every static frame now ends with vtsit.com.au · 1300 830 887, the same line closes every caption, and the reel end cards carry the number alongside the site. Written into the week gate as a check, so a post that loses it cannot ship. The number is National Sales, from your own signature — and you confirmed it on 7 September (below).
A fifth ground, shown but never chosen
Sue, 1 September: "In answer to using the darker blue - it’s a yes for a fifth background." Done — the deep blue is in the running rotation as the fifth ground, and the week gate now accepts it. Until this morning it refused to, which was the point: it had been shown to you and said to work, but never actually chosen, and those are different things. The rotation is now five grounds and the colour question is closed.
Colours guessed at without looking at your references
The first pass at your coral and your darker blue was built from the brand kit alone, because your two screenshots had not been opened. Both have now been looked at, and the darker blue in particular was wrong — it came out a mid interface blue when you meant the near black navy of the "weakest password" post. Rebuilt against what you actually sent.
"… out of scope — illustrative" at 15 seconds
Sue asked what the word was doing there. It is the disclosure the claims file requires — the scene is a general industry example, not a statement about a named provider or a VTS IT rate — but a lone adjective at the end of a sentence does not read as a label, which is why she had to ask. Re-cut: "Illustrative example — not a specific provider or rate", the label leading rather than trailing.
Control-room footage in "2:57am"
Scott flagged that it read as a video-editing suite rather than an IT environment. Replaced with engineers working on live infrastructure.
Sales or Helpdesk — a choice we made for you
Sue, 7 September: "Leave the number at National Sales ending in 887 - it actually goes to the same place for triage by our internal systems." Settled, and it stops being our judgement. 1300 830 887 is now written into the week gate as the only number the posts may carry — a caption that reaches for the Helpdesk line instead fails the check before it reaches you. The same check caught a real one on the way past: Wednesday’s Windows 10 caption had lost the contact line entirely. The artwork carried it; the typed caption did not. Fixed, and the caption half of the rule is now enforced rather than merely written down.
Three posts a week, on our assumption
Sue, 8 September: "We will leave it at three and run the analytics towards the end of the month." She asked whether three was overkill and whether any statistics underpinned it. The honest answer went back: no invented figures, the published guidance named for what it is, and two a week hers for the asking. She kept three — so three stops being our working assumption and becomes her instruction. It is now a check in the week gate like the rest of them: a week arriving with two posts or four fails before it reaches her. The plan had said "two plus a flexible third" since 25 August while every week shipped three, which is precisely how a rule that lives only in a sentence goes quietly wrong. The frequency question gets asked again at the end of September, against VTS IT’s own numbers rather than the industry’s.

The governing idea, in Glenn's words: the differentiator isn't cheaper hours or free call-outs — it's removing the constant decision about whether something is included. One environment. One managed service. One predictable cost.

01 · Where VTS IT stands

The story is loud. The channels are silent.

2024
the last video VTS IT published — the channels have been dark since
30+
clients whose approved stories are already on the website, ready to retell
6
cities of presence with no content telling anyone about it
1
headline competitors will never copy: calling out MSP pricing on your own homepage

Every week the channels stay quiet, the boldest positioning in Australian managed IT — genuine one-cost transparency — goes unproven in the one place buyers actually look before they call: LinkedIn. The fix isn't more effort from your team. It's a system that publishes consistently without depending on anyone's spare time.

02 · The benchmark

You've already tried this. The idea was right.

Your 2024 video — "The Truth About MSPs" — had exactly the right story: fixed-cost agreements that aren't, hourly surprises, and VTS IT covering everything including hardware failures. What it lacked was a production system behind it. That's the difference the machine makes:

"The Truth About MSPs" — VTS IT, May 2024. The right story, the wrong system.

The 2024 attempt

  • One video, then silence — no cadence, no follow-through
  • Generic AI presenters in nobody's brand
  • Script muddle: the competitor's billing behaviour reads as yours
  • Published to an empty YouTube channel where no buyers look

So we didn't just describe the difference — we produced it. The same story your video tells, remade two ways, below.

03 · The proof

Four formats. Made before you'd briefed us.

All of it was built from what was already public or already yours — your website, your logo files, and the proposition Sue set out. No shoot, no crew, no studio. This is the machine's normal weekly output, not a special effort:

Video

Format 01 · Motion graphic

"The MSP Maths"

The numbers told straight: what "fixed cost" turns into once out-of-scope work starts, and what One Cost actually includes.

Read the post caption
Your MSP quote says "fixed cost." Then the year happens. A rebuild after an infrastructure failure. A ticket that turns out to be "out of scope." A project nobody budgeted for. Each one arrives with its own invoice, and none of them were in the number you were quoted. That's not a fixed cost. That's an estimate wearing a suit. Under our One Cost Model the repair and rebuild labour is included, hardware is included where you're on HaaS, and "out of scope" isn't a conversation we have. Your IT budget stops being a forecast and starts being a number you can hold us to. One environment. One managed service. One predictable cost.#ManagedIT #ITBudgeting #MSP #AustralianBusiness
Format 02 · Story reel

"2:57am"

The same argument told through a night no business owner enjoys — licensed footage, your brand, the moment a rebuild becomes a project.

Read the post caption
2:57am. Your infrastructure just fails. Nobody enjoys that phone call. But the part that costs you isn't the night — it's what happens next. With most MSPs, fixing and rebuilding what failed becomes a project. A scope. A quote. A line item that wasn't in this year's budget. With VTS IT, that work is already included. The labour to repair and rebuild your infrastructure sits inside One Cost, and where you're on Hardware as a Service, the replacement hardware does too. One environment. One managed service. One predictable cost.#ITSupport #BusinessContinuity #ManagedServices #ITStrategy

Format 03 · LinkedIn document carousel

Format 04 · Single feed posts

Post: All MSPs are lying bastards when it comes to cost. Post: Two ways to price IT — most MSPs versus VTS IT One Cost. Post: The most expensive line on an IT invoice is the one nobody quoted.
Read the three post captions
1 — "All MSPs are lying bastards when it comes to cost" That line is on our own website. We've had a few phone calls about it. We put it there because the industry earned it. Saying it is easy; building the pricing to match is the harder part, and that's the bit we did. #ManagedIT #ITPricing #Transparency #MSP 2 — "Two ways to price IT" There are two ways to price managed IT, and only one survives a bad year. Most MSPs: fixed cost to a point, rebuild work becomes a project, a list of exclusions. VTS IT: one cost, repair and rebuild included, hardware included where you're on HaaS, your budget a guarantee rather than an opening position. Which column is your current agreement in? #ManagedServices #ITCosts #MSP #BusinessIT 3 — "The most expensive line on an IT invoice" It's never the monthly fee that hurts. It's the project that appeared in March, the rebuild in July, the thing that sat just outside the agreement. During business hours there is no in-scope/out-of-scope decision to have, and the surprises go with it. #ITBudgeting #ManagedIT #CFO #ITStrategyHashtags rotate per topic — 3–5 per post, never the same block twice.

Format 05 · The finished rotation — five grounds, with the coral stepped forward

This is the settled kit. Four grounds you confirmed on 31 August — navy, off white, near black, interface blue — and the deep blue you added as a fifth on 1 September. Coral is not a ground here on any rung; that ladder has been taken down. Five grounds now pass before any one comes round again, which is a fortnight of posting at three a week.

What you asked for instead of a coral ground was more coral, subtly, intermittently. It is built into the cycle below. Two things carry it: a slim coral rail down the left edge, and the oversized quote mark or numeral warmed toward coral. Nothing else moves — same grounds, same mark, same type. It lands on posts 2 and 4, so coral steps forward on part of the grid and is absent from the rest. That is what makes it an accent rather than a house style.

Post 1 — navy ground, no coral lift Post 2 — off white ground with the coral lift Post 3 — near black ground, no coral lift Post 4 — interface blue ground with the coral lift Post 5 — the deep blue you approved on 1 September, no coral lift

Posts 1, 3 and 5 are the grounds as they stand. Posts 2 and 4 carry the lift. Scroll the five as a row and the coral appears, disappears and comes back — which is the rhythm rather than the colour. One note worth your eye: the fifth ground sits next to the navy each time the cycle turns over, and they are both dark blues. If that reads flat on the page grid, moving the deep blue to third in the order fixes it and costs nothing.

Format 06 · The same post, before and after

Subtle is a word that hides a lot, so here is the difference on one post rather than four. Left is what ships today. Right is the same post with the lift.

Before — the off white post as it ships today After — the same post with the coral rail and warmed quote mark

If it wants to be stronger, say so and the rail widens. If it wants to be quieter, it narrows. It is one number.

Format 07 · The darker blue — decided, and in

Settled on 1 September: "it’s a yes for a fifth background." The deep blue has moved from a sample you were shown to a ground the machine may actually schedule, and the week gate now accepts it — it refused it right up until you said yes, because a colour shown is not a colour chosen. The candidate list is empty for the first time since 28 August: nothing is mid-decision.

The deeper blue, rebuilt as a near-black navy The off white ground as it stands today, for reference

The near black navy on the left, the off white on the right, for scale. It enters the rotation in fifth position, exactly as you put it — the four you confirmed keep the order you saw them in.

These are examples, not finished campaigns.

Consider everything here directional — the pacing, the wording, the music, the footage, the claims on screen. Nothing is fixed until you say it is, and the whole point of the weekly rhythm is that it keeps getting sharper: your feedback in the first month shapes the house style, and the style keeps tightening from there. What these prove isn't the final look — it's that the machine turns your story into finished, on-brand assets without taking your time to do it.

04 · The content

Four pillars. Each one sells a service and captures a lead.

Built directly from your own proposition: what you offer, what you're really selling, and the no-obligation hook that starts each conversation.

One Cost Managed IT

Selling predictability & accountability

The flagship. The honest maths of fixed-cost vs hourly-surprise, told weekly. Lead hook: Free IT Audit

Cybersecurity

Selling reduced business risk

Facts-first security content — no fear-mongering, no jargon. Lead hook: Cybersecurity assessment

Microsoft 365

Selling security + optimisation

What businesses pay for and don't use; what's misconfigured and exposed. Lead hook: M365 health check

Outsourced IT Department

Selling expertise without headcount

What a full IT department costs vs what it needs to. Lead hook: IT cost comparison

✓ Motion-graphic videos

Numbers-driven explainers in the VTS IT brand, paced to be read — the format your story was built for.

✓ LinkedIn carousels

Swipeable document posts — the five questions that separate a budget from an estimate — the highest-engagement B2B format.

✓ Client-story posts

Your approved testimonials, retold properly — real names only ever with written permission on file.

✓ Text posts in your voice

Sharp, direct, occasionally blunt — the register your homepage already set. We keep the edge, and keep it safe.

05 · How it runs

Five steps a week. One approval. Yours.

MON

Strategy digest

One-page plan for the week: posts, hooks, formats. Lands in your inbox.

YOUR OK

Approve by email

Reply "ok" — or reply with changes and a revised plan follows the same day. No logins, no tools.

TUE–WED

Build & QA

Every asset produced and passed through an independent quality gate.

WED

Scheduled

The week queued on LinkedIn with correct settings and disclosures.

ONGOING

You watch results

See every post before it fires; pull anything, any time. Monthly report.

VTS IT's total time cost: about ten minutes a week.

No briefing meetings, no draft ping-pong, no chasing. Silence is consent; veto is one click. Sue keeps the LinkedIn keys — nothing publishes without the door being opened from your side.

06 · Built-in protection

The compliance layer most agencies don't have

VTS IT's whole position is provable honesty about cost — so the content system enforces it mechanically. Every asset is checked against written rules before publishing:

Cost claims (ACCC-safe)

No "save up to X%" without dated evidence on file. One Cost claims match what your agreements actually say — the video that overclaims is the video that undoes the brand.

Security claims gated

Never "unhackable", never guaranteed protection, no naming breach victims, no fear-mongering. Facts, plainly stated.

Client permission on file

No client name, logo or story is used without written permission held before the asset passes QA.

The edge, kept safe

Your voice is blunt about the industry — and stays aimed at the practice, never a named competitor. Every pointed asset gets a defamation sanity check.

07 · Why Macrobin

Not a proposal to build a system. The system exists.

Macrobin already operates this machine end-to-end for another client — brand kit, weekly digest-and-approve loop, AI-assisted production line, independent quality gate, compliance rules enforced on every asset. For VTS IT it gets re-skinned, re-tuned for B2B LinkedIn, and switched on. No build risk, no learning curve billed to you.

Scoped to what VTS IT needs: content only.

Replies, email sequences and inbound enquiry handling exist as add-on packs when you want them. Numbers when the shape is right — let's talk.